Viabuild renewed the road and sewage system in the Canadalaan in Antwerp. An inner courtyard with made-to-measure concrete benches and 3 wadis was also constructed.
The excavation of the courtyard was done by means of a Bull with 3D motion control system. This way earth movement was kept to a minimum and the wadi could be dug out in only one operation. The works were hampered by the presence of a large quantity of waste and rubble in the subsoil.
There was a lot of painstaking work involved in placing the made-to-measure concrete seating elements in line with the designs in order to obtain the beautiful result.
-
PROJECT
Construction of public space
-
KLANT
VMSW
-
BUDGET
€ 1,2M
-
PERIODE
April 2018 - present